Hebei Deep Ocean Pipeline Manufacturing Co.,Ltd Company Logo Hebei Deep Ocean Pipeline Manufacturing Co.,Ltd
5 1

HDG Malleable Iron Pipe Fittings 90 Elbow

Contact Now* Send an Inquiry to this supplier.
or
Start Order * Name your price

Browse by Category

Contact us

Hebei Deep Ocean Pipeline Manufacturing Co.,Ltd
[China]

Address
YANTA ROAD Cangzhou Hebei
Phone
86-0317-13380102
Contact name
Wang Liting

Quick Information

  • Brand Name: TSZHONGRAN
  • Place of Origin: China
  • Model Number : 15613380102
  • Connection : Male
  • Head Code : Square
  • Material : Alloy
  • Shape : Equal
  • Technics : Casting
  • Type : Elbow
  • :

Description

Main Processing Technology

Raw materials entering the factory (re-inspection) → Cut into blanks → Hot Push Forming → Plastic → Heat Treatment → Machining Groove → Surface Treatment → Inspection of Finished Products → Identification Protection → Put In Stock
(Note: There is a pickling and passivation process for stainless steel products before surfacetreatment)

Size

1/2"-120"
 
 
 
 
 
Standard
ASTM A234WPB, WPC, WP11, WP12, WP5, WP91, WP22
ASTM A403WP304, WP304L, WP316, WP316L, WP321
ASTM A420WPL3, WPL6
API 5LL245(NB), L290(X42), L320(X46), L360(X52), L390(X56), L415(X60), L450(X65), L485(X70), L555(X80)
EN 10253-2
P235GH, P265TR2, P265GH, P355NHL245(NB), L290(X42), L320(X46), L360(X52)
L390(X56), L415(X60), L450(X65), L485(X70), L555(X80)
ASTM A105A105, A105N
ASTM A350LF1, LF2, LF3
ASTM A694F42, F45, F50, F52, F56, F60, F65, F70
ASTM A182F5, F9, F11, F22, F91, F304, F304L, F316, F316L, F316H, F321 F347 F347H
Wall ThicknessSCH5, SCH10, SCH20, SCH30, STD, SCH40, SCH60 XS, SCH80, SCH100, SCH120, SCH140, SCH160, SCHXXS
ColorBlack, Yellow, Blue, Red. etc as client requirment.
Surface CoatingRust-proof oil; Black; Galvanized; Polyethylene Coating; Epoxy Coating, etc
MarkingMarker permanent
PackagePly-Wooden Case for small size  Pallet for big size
CertificateBV ISO9000,CRN,CE
The Third Party InspectionBV, SGS, LOIYD, TUV, and other party alloyed by clients
BrandTSZHONGRAN
Min Order1PCS
Payment TermsT/T, 100% LC AT SIGHT, 100% LC 30 OR 60DAYS AFTER BL OF DATE,
Delivery Time7-30days according to acutal order.
Delivery PortTIANJIN, QINGDAO, SHANGHAI
Delivery Ability3000TONS/MONTH
ApplicatingPaper-marking, Oil and natural gas pipeline, Boiler and heat exchanger, Smelting,Water conservancy, Electric power, Chemical, Pharmaceuticals etc
Main Equipment and Installation

1.Hydraulic pusher 1, maximum thrust 350T, mainly pushing DN250 above pipe fittings
2.Lead screw mechanical pusher 1, maximum thrust 160T, mainly pushing DN200 below pipe fittings
3.Medium Frequency Heating Equipment 1, 250KW (Hengkai), Maximum Heating Temperature 1200℃
4.Medium Frequency Heating Equipment 1, 160KW (Hengkai), Maximum Heating Temperature 1050℃
5.Machining equipment: lathe D620-1 TX50 power head lathe: JT250 TX50 TX63A lathe 16K40 boring machine T6112 lathe CQ61100
6.Heat treatment furnace (trolley box resistance furnace) RT9-80*1500*60, maximum furnace temperature 1200℃7.Sandblasting machine 2 sets: mainly used for surface rust removal of pipe fittings
8.Inductors (self-made): 60 Sets for material heating
9.Pushing core head (self-made): 126 Sets for forming guarantee
10.Air compressor: Air cooling for heat treatment
11.Machining Fixtures (Special) 76 Sets
12.315T Hydraulic press 1 set (Mainly used for elbow shaping)

Wall  ThicknessSCH5, SCH10, SCH20, SCH30, STD, SCH40, SCH60 XS, SCH80, SCH100, SCH120, SCH140, SCH160, SCHXXS
ColorBlack, Yellow, Blue, Red. etc as client requirment.
Surface  CoatingRust-proof oil; Black; Galvanized; Polyethylene Coating; Epoxy Coating, etc
MarkingMarker permanent
PackagePly-Wooden Case for small size  Pallet for big size
CertificateBV ISO9000,CRN,CE
一.Acceptance and acceptance of raw materials
1、Raw materials shall meet the requirements of relevant standards or technical specifications.
2、The surface of raw materials should be free from oil pollution, excessive rust corrosion and obvious dent defects, low melting point metal pollution, etc.
3、Check the quality certificate, furnace number, batch number, specifications of raw materials, manufacturers and implementation standards.
4、The raw materials are mechanically de-rusted with wire brushes to meet the requirements of non-destructive testing.
5、Dimension testing of raw materials (length, width, thickness and unevenness of steel tubes).
6、After entering the factory, the steel pipe and steel plate should be re-examined by ultrasonic wave. Grade I is qualified.
7、Physical and chemical testing, chemical element analysis, mechanical properties and hardness testing of steel pipes and steel plates are carried out according to furnace batch number and specifications. The test results should meet the requirements of raw material standards.
8、After reexamination, the factory shall register the number according to the factory regulations.
二.Manufacturing Process
①Selection of raw material:elbow selection of appropriate steel plate or steel pipe, with template marking with oxyacetylene flame or sawing machine cutting, and raw materials furnace, batch number and pipe specifications, engineering name, number clearly marked.
②Rolling and welding the steel plate.
③The mandrel is loaded into the pusher by crane, the blank is further cleaned up, the inner wall is coated with graphite, and then mounted on the pusher (according to the length of the blank, more than one can be installed at a time). The mandrel is locked with a plug board, and the internal mould is preheated to the appropriate temperature for pushing (heating temperature and propulsion speed should be the best match).
④Adjust the intermediate frequency heating ring, heating the billet to the required temperature, and control the propulsion speed.
⑤Buckle bending. Correct the curvature radius of the formed elbow on the hydraulic press with suitable tool.
⑥To remove the end, according to the elbow specifications, use appropriate tools to align on the beveling machine, then fix the cutting gun, cut off the excess blank, and leave processing allowance for the car mouth.
⑦Shaping, clamping elbow with special tire and shaping port on press with brace.
4.Heat treatment: According to the heat treatment process, the elbow is put into the furnace for heat treatment.
5.Surface treatment: After heat treatment, the surface oxide scale of the pipe is removed by sandblasting machine.
6.After surface treatment, 100% radiographic inspection of elbow welds after surface treatment, and the second grade was qualified.
7.Mechanical properties testing: According to relevant standards, mechanical properties of elbows are tested to ensure that the mechanical properties of elbows meet the standards, and the testing items and sampling directions should meet the requirements of relevant standards.
8.End processing: mechanical end processing grooves according to design confirmation drawings. Within the range of 50mm from the end of the pipe, the excess height of the internal and external welds is grinded by an angle grinder.
9.Appearance detection
①There should be no cracks on the elbow and no hard spots on the surface.
②Welding repair is not allowed for any defect on elbow pipe body.
10.Dimension inspection: The company's relevant inspectors, according to the drawings and pipe fittings of the relevant standard requirements for dimensional inspection, and to meet their tolerance requirements.
11.Surface treatment: The inside and outside surfaces of elbows should be smooth, without any damage to strength and appearance defects, such as scars, scratches, heavy skins, etc. When defects are found, they should be repaired. The thinning of the repaired parts should be no less than 93.5% of the original wall thickness. The repaired parts should be smooth, and the defects should be cleared by dye or magnetic powder inspection.
12.Nondestructive testing of elbows
After the elbow heat treatment, the company holds the relevant qualification certificate personnel, according to the standard requirements of the elbow magnetic powder, ultrasound, test results reached the level I qualified.
13.Identification
Mark with a spray-brush or low-stress impression, and clearly mark the contents required by the standard on the outer wall in sequence.
14.Storage and transportation of elbows

Elbows should not contact any part of the carriage during transportation to avoid bumping.


Certificates

  • CCC : 035041Q30081ROM

Price

  • Delivery Port : PlyWooden Case for small size Pallet for big size

Packaging & Delivery

  • Packing :PlyWooden Case for small size Pallet for big size

Product Image

  • HDG Malleable Iron Pipe Fittings 90 Elbow image

Send an Inquiry to this supplier

Send an Inquiry to this supplier
* From
  To Wang Liting
Hebei Deep Ocean Pipeline Manufacturing Co.,Ltd
* Buying Product
- Please enter your specific buying item.
e.g. 42 inch LCD TV, leather executive chair
Category : Pipe Fittings
* Message

Use English only Max. 2000 characters. (Min. 20)

Send
EC21.com does not guarantee the validity of product information or the credentials of sellers.